Onsite Stimulation Inventory

From MPSWiki
Revision as of 15:36, 31 May 2018 by Svan (talk | contribs)
Jump to: navigation, search

Totals by Stage

Parameters are related to selected proppant.


Stimulation inventory steps and jobs.png

  • Received before Job - the sum of all incoming tickets and/or box runs before the job start date/time, when there are several steps with the same job number - all tickets and runs between the steps and all tickets and runs before the first step of this job numbers are used.
  • Used Before Job - the sum of all straps used values within the same intervals / logic as above.
  • Strap at Job Start - this will be the same thing you would find at the job start date/time in the inventory balance history!
  • Strap at Job End - this will be the same thing you would find at the job end date/time in the inventory balance history!
  • Received during Job - sum of all incoming tickets or box runs with the date time between start and end of job (sum of all the stages for related job)
  • Job Used (Strap) - sum of strap used values during the job (sum of all the stages for related job)
  • Boxes On Site at Job Start - total of all of the boxes that have box runs that have NOT been strapped to zero (i.e. have non-zero proppant in them at this moment)!
  • Boxes Incoming during Job - number of boxes that were run during the job (between start/end date/time)(sum of all the stages for related job).
  • Incoming Tickets Count - this is the number of incoming tickets (boxes or units/bins) that were added during the job (between start/end date/time)(sum of all the stages for related job).