Difference between revisions of "Onsite Stimulation Inventory"
Line 23: | Line 23: | ||
'''Totals by Job''' | '''Totals by Job''' | ||
− | + | Summary parameters below are related to selected proppant. | |
Line 32: | Line 32: | ||
*'''Used Before Job''' - the sum of all straps '''used''' values within the same intervals / logic as above. | *'''Used Before Job''' - the sum of all straps '''used''' values within the same intervals / logic as above. | ||
− | *'''Strap at Job Start''' - | + | *'''Strap at Job Start''' - amount of proppant available at job start calculated as received proppant minus used before proppant. |
− | *''' | + | *'''Received during Job''' - sum of all incoming tickets or box runs with the date time between start and end of job (sum of all the stages for related job). |
− | *''' | + | *'''Job Used (Strap)''' - sum of strap '''used''' values during the job (sum of all the stages for related job). |
− | *'''Job | + | *'''Strap at Job End''' - amount of proppant left after the job is finished calculated as strap at start minus plus received during job minus used during job. |
*'''Boxes On Site at Job Start''' - total of all of the boxes that have box runs that have NOT been strapped to zero (i.e. have non-zero proppant in them at this moment)! | *'''Boxes On Site at Job Start''' - total of all of the boxes that have box runs that have NOT been strapped to zero (i.e. have non-zero proppant in them at this moment)! | ||
Line 45: | Line 45: | ||
*'''Incoming Tickets Count''' - this is the number of incoming tickets (boxes or units/bins) that were added during the job (between start/end date/time)(sum of all the stages for related job). | *'''Incoming Tickets Count''' - this is the number of incoming tickets (boxes or units/bins) that were added during the job (between start/end date/time)(sum of all the stages for related job). | ||
+ | |||
+ | |||
+ | ''Job Used (Model) = you don’t have to have this column in Onsite yet… we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation results | ||
+ | Job Used (Schedule) = you don’t have to have this column in Onsite yet… we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation treatment schedule | ||
+ | Job Used (Original Design) = you don’t have to have this column in Onsite yet … we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation stimulation treatment schedule LINKED ORIGINAL DESIGN STS!'' |
Revision as of 15:59, 31 May 2018
Common
Inventory Steps
Proppant Setup
Sieve Test
Unit Configuration
Bin Configuration
Box Configuration
Boxes Incoming
Proppant Incoming
Proppant Straps
Proppant History
Totals by Job
Summary parameters below are related to selected proppant.
- Received before Job - the sum of all incoming tickets and/or box runs before the job start date/time, when there are several steps with the same job number - all tickets and runs between the steps and all tickets and runs before the first step of this job numbers are used.
- Used Before Job - the sum of all straps used values within the same intervals / logic as above.
- Strap at Job Start - amount of proppant available at job start calculated as received proppant minus used before proppant.
- Received during Job - sum of all incoming tickets or box runs with the date time between start and end of job (sum of all the stages for related job).
- Job Used (Strap) - sum of strap used values during the job (sum of all the stages for related job).
- Strap at Job End - amount of proppant left after the job is finished calculated as strap at start minus plus received during job minus used during job.
- Boxes On Site at Job Start - total of all of the boxes that have box runs that have NOT been strapped to zero (i.e. have non-zero proppant in them at this moment)!
- Boxes Incoming during Job - number of boxes that were run during the job (between start/end date/time)(sum of all the stages for related job).
- Incoming Tickets Count - this is the number of incoming tickets (boxes or units/bins) that were added during the job (between start/end date/time)(sum of all the stages for related job).
Job Used (Model) = you don’t have to have this column in Onsite yet… we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation results
Job Used (Schedule) = you don’t have to have this column in Onsite yet… we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation treatment schedule
Job Used (Original Design) = you don’t have to have this column in Onsite yet … we will figure out a way to read this from the input file and display it… in PHX, it should come from the linked stimulation simulation stimulation treatment schedule LINKED ORIGINAL DESIGN STS!