Difference between revisions of "Cementing (Model Outputs)"
(→Depth Channels) |
|||
Line 21: | Line 21: | ||
<code>D</code> - = effective diameter of the cement column, in. (hole diameter minus pipe diameter) | <code>D</code> - = effective diameter of the cement column, in. (hole diameter minus pipe diameter) | ||
+ | |||
''Note: when excess volume is entered - hole diameter is calculated from effective diameter'' | ''Note: when excess volume is entered - hole diameter is calculated from effective diameter'' |
Latest revision as of 11:57, 24 August 2018
Depth Channels
- Overbalance Pressure - The amount of pressure in the wellbore that exceeds the pressure of fluids in the formation. Calculated as
OBP=AP-PP
AP
- annulus pressure;
PP
- reservoir pore pressure;
- Gas-flow potential factor - is the estimated amount of gas flow that can be expected from a formation. Calculated as
GFPF=MPR/OBP
OBP
- Overbalance Pressure
MPR
- Theoretical maximum pressure restriction. Calculated as
MPR=SGS/300*L/D
SGS
- Static gel strength, lb/100 sq f (Entered on the Fluid Recipe Page)
300
- Conversion factor (to obtain MPR in psi), lb/in
L
- length of the cement column, ft
D
- = effective diameter of the cement column, in. (hole diameter minus pipe diameter)
Note: when excess volume is entered - hole diameter is calculated from effective diameter